How to let the V-ray tier A (up to 6 cores) usage covered by V-ray tier B (+8 cores) license

How to let the V-ray tier A (up to 6 cores) usage covered by V-ray tier B (+8 cores) license?

Hi,

We buy 10 V-ray tier B (+8 cores) license and have installed them.

We found Backup Exec 2014 detected we have installed 10 V-ray tier B (+8 cores) license and use 2.

Backup Exec 2014 also detected we have installed 0 V-ray tier A up to 6 cores) license and use 8.

How can we let the V-ray tier A (up to 6 cores) usage covered by V-ray tier B (+8 cores) license?

原廠的回覆

【Case # 08497250 – How to let the V-ray tier A (up to 6 cores) usage covered by V-ray tier B (+8 cores) license? has been created】

关于您VM License的问题,我们向后线以及国外的研发进行了咨询和确认:

1.  目前您可以正常使用。V-ray tier B (+8 cores) license可以为未来服务器升级进行准备。

2.  备份和还原任务都不影响使用。

3.  这个问题,我们也会向研发部门进行反应,在未来的版本中,添加V-ray tier B License 向下兼容这个功能。

有问题随时和我联系。谢谢您的支持。

 